13 self-delivered activities

From the first survey peg to the last maintenance visit

These are the disciplines we carry out with our own crews, plant and engineers. Nothing critical to programme sits with a subcontractor by default.

01

Enabling & Groundworks

Establishing control, clearing the ground and forming the platform.

2 activities

02

Structures

Concrete, masonry, steel and pavement — the permanent works.

5 activities

03

Services & Installation

Water, power and mechanical systems installed and integrated.

3 activities

04

Completion & Handover

Finishing, proving performance and keeping the asset running.

3 activities

Stage 01

Enabling & Groundworks

Establishing control, clearing the ground and forming the platform.

Site Surveying and Setting Out

Establishing survey control and transferring the design onto the ground to millimetre accuracy.

  • Topographic and as-built surveys
  • GNSS and total-station control networks
  • Setting out of alignments, levels and structures
  • Volumetric and quantity surveys
  • Machine-control model preparation

Earthworks and Excavation

Bulk cut and fill, trenching and formation preparation with GPS-guided plant.

  • Site clearance and topsoil stripping
  • Bulk excavation and cut-to-fill balancing
  • Trenching, shoring and dewatering
  • Engineered fill, compaction and density testing
  • Rock breaking and controlled blasting

Stage 02

Structures

Concrete, masonry, steel and pavement — the permanent works.

Concrete Works

Batching, placing, finishing and curing concrete to specified strength and durability classes.

  • Mix design and on-site batching
  • Mass, blinding and structural pours
  • Formwork, falsework and shuttering
  • Slipform and jumpform construction
  • Cube testing, curing and defect control

Reinforced Concrete Structures

Frames, decks, cores and foundations — cut, fixed and cast to structural drawings.

  • Pad, raft, pile-cap and strip foundations
  • Columns, beams, slabs and shear cores
  • Post-tensioned and pre-stressed elements
  • Retaining and water-retaining structures
  • Rebar detailing, cutting and fixing

Masonry Works

Block, brick and stone walling, plastering and rendering to line, level and plumb.

  • Concrete block and clay brick walling
  • Natural and dressed stone masonry
  • Plastering, rendering and screeding
  • Cladding and facing works
  • Boundary walls and hardscape

Structural Steel Works

Fabrication, erection and protective treatment of steel frames and secondary steelwork.

  • Workshop fabrication and pre-assembly
  • Portal frames, trusses and long-span roofs
  • Bolted and welded connections with NDT
  • Galvanising, painting and fire protection
  • Handrails, stairs, gratings and platforms

Asphalt Paving

Sub-base, base and wearing courses laid and compacted to profile, density and ride quality.

  • Granular sub-base and base construction
  • Bituminous base, binder and wearing courses
  • Milling, resurfacing and overlays
  • Prime and tack coat application
  • Road marking, kerbing and furniture

Stage 03

Services & Installation

Water, power and mechanical systems installed and integrated.

Plumbing and Drainage

Potable water, foul and storm drainage installed, jointed, pressure-tested and certified.

  • Internal water reticulation and sanitaryware
  • Foul and storm drainage networks
  • Manholes, chambers, gullies and outfalls
  • Pump stations, tanks and boosters
  • Pressure testing and CCTV survey

Electrical Installation

LV and HV distribution, lighting, earthing and standby power installed to wiring regulations.

  • Containment, cabling and terminations
  • Switchgear, distribution boards and panels
  • Internal, external and street lighting
  • Earthing, bonding and lightning protection
  • Generators, UPS and solar backup

Mechanical Installation

HVAC, pumps, pipework and process equipment set, aligned, connected and proven.

  • HVAC plant, ductwork and controls
  • Pumps, compressors and pressure systems
  • Process pipework and pipe supports
  • Equipment setting, grouting and alignment
  • Fire suppression and specialist gases

Stage 04

Completion & Handover

Finishing, proving performance and keeping the asset running.

Finishing Works

The visible layer — joinery, glazing, tiling, painting and fit-out to benchmark standard.

  • Floor, wall and ceiling finishes
  • Joinery, doors, ironmongery and partitions
  • Aluminium windows, glazing and façades
  • Painting, decorating and protective coatings
  • External works and landscaping

Testing and Commissioning

Proving every system against specification before the asset is signed over.

  • Material and workmanship testing regimes
  • Hydraulic, pressure and watertightness tests
  • Electrical verification and load testing
  • Integrated systems commissioning
  • As-built records, O&M manuals and training

Operation and Maintenance

Keeping the asset performing through defects liability and long-term service contracts.

  • Defects liability and snagging close-out
  • Planned preventive maintenance regimes
  • Reactive repairs and emergency response
  • Condition surveys and asset reporting
  • Routine and periodic road maintenance

Applied across

The same disciplines, ten different sectors

A concrete crew that pours a hospital raft one month is casting a quay-wall capping beam the next. The standards do not change.

Specialist packages

We also deliver single packages for other contractors.

Earthworks, piling, structural steel, asphalt or testing and commissioning — taken on as a standalone subcontract package where a main contractor needs capacity.